German International
School Sydney (GISS)

Learn more

Model Project
s.e.ed.

s.ustainable e.nvironmental ed.ucation spaces

 

KLH® – CLT was integral in the build of these unique 82 square meter classrooms, built to the German Passivhaus Standard. With careful off-site prefabrication, the RAICO Pacific team were able to assemble the all three learning spaces on-site in less than 5 hours!

 

AWARDS

  • 2022 Sustainability Awards: WINNER “Education & Research”
  • 2022 Timber Design Awards: WINNER “Sustainability”
  • 2022 Timber Design Awards: WINNER “Small Budget”
  • 2023 LEA NSW Award: Commendation “Small Projects”

Project Info

The three s.e.ed. classrooms, offer a healthy and comfortable learning environment for students of the German International School Sydney (GISS). Nestled within a nature-filled learning campus, they provide a modern, eco-friendly alternative to the traditional demountable classrooms found across Australian schools.

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Educational Buildings

Wen-Xian

Architecture that brings together learning and social interaction

Healthcare Buildings

Ronald McDonald House

Timber construction offering social benefits for families whilst their children are undergoing medical treatment

Single Family Houses

Private House

A two-storey detached house demonstrates the potential of KLH® – CLT in residential construction.

Educational BuildingsPassive Houses

TIGS

Australia’s first all-CLT Passivhaus school building, showcasing advanced mass timber construction, energy-efficient design, rapid installation, and innovative learning spaces.

Refurbishment & Extensions

Universitätssternwarte

Modern workspaces and office facilities for newly appointed professorships

Public Buildings

Outdoor swimming pool

Outdoor swimming pool comprehensively and contemporary modernised

Public Buildings

Sports Center

A modern sports center with a structural framework made of KLH® – CLT.

Refurbishment & Extensions

New Lodge Farm

A residential complex comprising four modern houses

Public Buildings

Penny

Modern retail premises built from cross-laminated timber

Refurbishment & Extensions

Museo del Mar

Restoration of a historic and listed building

Without
registration,
anytime,
anywhere

KLH DESIGNER

data+ | statics2d | co2

Learn more

We are there for you.
+43 3588 8835
office@klh.at

Sites:
KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch
KLH Massivholz Wiesenau GmbH
Wiesenau 2
A-9462 Bad St. Leonhard

We are there
for you.