Harris Academy Sutton

Learn more

First Passivhaus
Secondary School

The four-storey, six-for entry school accommodates 1,275 pupils and 95 staff within the impressive 10,625 m2 space. The superstructure consists predominantly of offsite manufactured glulam beam and columns and Cross laminated timber (CLT) wall and slab elements.

 

Classrooms are light and inspiring with optimised spatial orientation. The timber roof panels reflect the natural harmony of the building, with non-toxic materials providing exemplary air quality and environmental credentials.

The stunning 715 m2 sports hall is internally finished with exposed timber. The facility is used by students as well as local residents after hours, contributing to the healthy living values of the wider site.

Project Info

Total stored/sequestered carbon in the KLH panels for the Harris Academy project is 660 tonnes.

Download Fact Sheet

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Public Buildings

ST ALBANS

A building that defines the cultural centre of the community.

Refurbishment & Extensions

La Tour Watt

Public Buildings

Bronx Children´s Museum

A museum that brings children closer to nature and urban culture.

Modular construction

Montessori School

A modular timber school building for primary and secondary school children

Educational BuildingsPassive Houses

GISS

s.ustainable e.nvironmental ed.ucation spaces   KLH® – CLT was integral in the build of these unique 82 square meter classrooms, built to the German Passivhaus Standard.…

Educational Buildings

Kinderhaus Kreuzfeld

An architectural masterpiece. Sustainably built with visible KLH® – CLT, it offers children an inspiring environment for education and community.

HotelsModular construction

Twente – Family Homes

Sustainable and solid prefabricated houses

Educational BuildingsRefurbishment & Extensions

HLT Retz

The original building from the 1970s underwent an expansion with the addition of a courtyard building. This new structure seamlessly connects to the existing one, thanks…

Hotels

Houten Hotel Almere

Addition to an existing restaurant with over 172 hotel rooms on four floors.

Refurbishment & Extensions

Timber Lofts

A new four-story building and the renovation and reuse of an existing five-story industrial building

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.
+43 3588 8835
office@klh.at

Sites:
KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch
KLH Massivholz Wiesenau GmbH
Wiesenau 2
9462 Bad St. Leonhard

We are there
for you.