News

Fire protection with KLH® – CLT

Learn more

tested in
Australia and
New Zealand

Even though fire knows no national borders, there are different experiences and national developments when it comes to fire protection. Particularly in countries outside the EU, the requirements for testing and verification to ensure fire protection with timber construction products differ.

In Australia, the test standard AS 1530:2014 “Methods for fire tests on building materials, components and structures, Part 4: Fire-resistance test for elements of construction” is used to test burn-off and resistance in the event of fire.

A total of four tests were successfully carried out, two wall and two ceiling tests. As usual, the standard wood species spruce and the PU adhesive from the Loctite HB S series were used. The use of the heat-resistant Loctite HB X adhesive would improve the results even further. The element connection was also tested via a cover board on the side facing away from the fire using suitable sealing tape. A locally available 13 mm fire protection plasterboard was also tested in two of the trials. An optimised way of screw connection led to a better performance of the cladding.

The aim was to achieve FRL values (similar to REI) of 90 to 120 minutes. The resistance times were exceeded in all cases.

The results once again verify the chapter “Structural fire design” published in ETA-06/0138 for KLH® – CLT. These successful tests open up new possibilities for the use of KLH® – CLT on the Australian and New Zealand markets.

Find a partner
in your area.

To the interactive map

More News & Events

Publications

Timber Arch Vol. 04

On our journey through the world of timber architecture, we now find ourselves at the opening line of the fourth edition of Timber Arch. As in…

News

Component catalogue

KLH Massivholz GmbH presents its latest innovation: the extended component catalogue, which is now available online. The revision of the catalogue aims to offer users an…

News

Tower of Wind

The project in the heart of Copenhagen pays homage to the world’s first meteorological observation station, the historic “Tower of Wind” in Athens.

News

Non-Fire Spread Classification

KLH® – CLT Exterior Walls receive Non-Fire Spread Classification in Poland

Publications

Timber Arch Vol. 03

We are all responsible for this one and future generations. If we want to combat climate change, we will have to use even more wood in…

News

Sustainability in logistics

The KLH plant in Bad St. Leonhard, Carinthia, not only has the most modern automated production line, but also a very well-developed railway infrastructure with its…

News

Förderpreis.nachhaltig 2021

THIS YEAR, KÄRNTNER SPARKASSE AG’S SUSTAINABILITY AWARD GOES TO KLH MASSIVHOLZ WIESENAU GMBH AND WEISSENSEER HOLZBAUSYSTEMBAU GMBH

Publications

Timber Arch Vol. 02

Special times require special attention. Treat yourself to some time out and enjoy the following pages with us. Thanks to the editorial support of the respective…

News

AITIM Quality Mark

KLH holds the AITIM Quality Mark – SCA nº 31-01 for the Manufacture of Cross-Laminated Timber since 2007

News

Nordic Swan Ecolabel

In addition to the EPD (Environmental Product Declaration), KLH Massivholz GmbH has now also received the Nordic Swan Ecolabel (Licence No. 3010 0030), one of the…

News

Project “KLH Wolfsberg”

Sustainability is a way of life at KLH Massivholz GmbH. The opening of what will be the most modern cross-laminated timber plant is planned for summer…

News

Environmental Product Declaration

EPD in accordance with ISO 14025 & EN 15804

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.
+43 3588 8835
office@klh.at

Sites:
KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch
KLH Massivholz Wiesenau GmbH
Wiesenau 2
9462 Bad St. Leonhard

We are there
for you.