HLT Retz

Learn more

The Extension

The original building from the 1970s underwent an expansion with the addition of a courtyard building. This new structure seamlessly connects to the existing one, thanks to a strategically placed staircase core. What sets this timber construction project apart are its intricate details and the utilization of various timber components. These include the timber frame construction method, KLH® – CLT wall and ceiling elements, ribbed ceilings, and timber-concrete composite ceilings. The expansion of HLT Retz serves as a remarkable example of sustainable timber construction and contemporary architectural design.

Project Info

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Passive Houses

Lilyfield

A certified Passivhouse Premium

Public Buildings

Tourist office Orelle

tourist office with holiday flat

Refurbishment & Extensions

Raiffeisenbank

Modern architecture in the centre of St. Johann

Public Buildings

Botanical Garden

First public facility with KLH® – CLT in Poland

Refurbishment & Extensions

Cremorne

3-storey extension to a 100-year-old cottage

Healthcare Buildings

Grote Kreek

The first wooden social building in the Netherlands

Public Buildings

ST ALBANS

A building that defines the cultural centre of the community.

Refurbishment & Extensions

La Tour Watt

Public Buildings

Bronx Children´s Museum

A museum that brings children closer to nature and urban culture.

Modular construction

Montessori School

A modular timber school building for primary and secondary school children

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.
+43 3588 8835
office@klh.at

Sites:
KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch
KLH Massivholz Wiesenau GmbH
Wiesenau 2
9462 Bad St. Leonhard

We are there
for you.