Hayama’s Studio

Learn more

An innovative
construction material
from Austria

A total of 132 boards were required for this project and their production took two days. Following the assembly sequence, the KLH boards were duly loaded into the containers which allowed for trouble-free processing on location.

90 days later, the boards arrived at the port of Imari in Saga Prefecture while the foundation building process on site continued according to plan. Thus, no time was lost. In fact, the construction period could be further shortened thanks to the use of KLH solid timber boards.

Project Info

155 cubic metres of KLH solid timber boards which had been transported to the site in four 40 foot containers were used for the construction of Hayama’s Studio.

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Public Buildings

Frampton Park Baptist Church

In the heart of Hackney, London, there is a church that is not only a place of prayer, but also a place for a leisurely meeting

Single Family Houses

Haus Gables

One of the first residential buildings in the USA made of cross laminated timber

Multi-story Residential Buildings

Murray Grove

Schools & Kindergartens

Streatham and Clapham School

Public Buildings

Trittkopfbahn in Zürs

Mountain, middle and valley station of the gondola lift

Office Buildings

Seeparkcampus West

A state-of-the-art office building in sustainable wood construction with attractive and functional workplaces and rooms

Single Family Houses

Dual Occupancy Home Payer

Multi-story Residential Buildings

Forte Tower Melbourne

Sustainability on 10 floors in the metropolis Melbourne

Single Family Houses

Bungalow With Atrium

Student Dormitory

UEA Blackdale

The new dormitory for more than 500 students

2019 A+Awards
Jury Winner

Learn more

We are there for you.

+43 3588 8835
office@klh.at

KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch

We are there
for you.