Hayama’s Studio

Learn more

An innovative
construction material
from Austria

A total of 132 boards were required for this project and their production took two days. Following the assembly sequence, the KLH boards were duly loaded into the containers which allowed for trouble-free processing on location.

90 days later, the boards arrived at the port of Imari in Saga Prefecture while the foundation building process on site continued according to plan. Thus, no time was lost. In fact, the construction period could be further shortened thanks to the use of KLH solid timber boards.

Project Info

155 cubic metres of KLH solid timber boards which had been transported to the site in four 40 foot containers were used for the construction of Hayama’s Studio.

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Public Buildings

Children’s Course

Multi-storey Residential Buildings

Multi-storey Residential Building in Vertou

Multi-storey Residential Buildings

Social housing estate in Saulx-Les-Chartreux

Public Buildings

Beccult

Public Buildings

Nature & Découvertes

Single Family Houses

Terraced Houses Fischerweg

Passive HousesSingle Family Houses

Villa in B.

Refurbishment & Extensions

Extension Frankfurt

Multi-storey Residential BuildingsPassive Houses

8-storey Residential Building

Multi-storey Residential Buildings

Terraced Houses in Klagenfurt

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.

+43 3588 8835
office@klh.at

KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch

We are there
for you.