Hayama’s Studio

Learn more

An innovative
construction material
from Austria

A total of 132 boards were required for this project and their production took two days. Following the assembly sequence, the KLH boards were duly loaded into the containers which allowed for trouble-free processing on location.

90 days later, the boards arrived at the port of Imari in Saga Prefecture while the foundation building process on site continued according to plan. Thus, no time was lost. In fact, the construction period could be further shortened thanks to the use of KLH solid timber boards.

 

 

 

Project Info

155 cubic metres of KLH solid timber boards which had been transported to the site in four 40 foot containers were used for the construction of Hayama’s Studio.

Find a partner
in your area.

To the interactive map

More References

References &
Inspirations

 

Refurbishment & Extensions

La Tour Watt

Public Buildings

Bronx Children´s Museum

A museum that brings children closer to nature and urban culture.

Modular construction

Montessori School

A modular timber school building for primary and secondary school children

Educational BuildingsPassive Houses

GISS

s.ustainable e.nvironmental ed.ucation spaces   KLH® – CLT was integral in the build of these unique 82 square meter classrooms, built to the German Passivhaus Standard.…

Educational Buildings

Kinderhaus Kreuzfeld

An architectural masterpiece. Sustainably built with visible KLH® – CLT, it offers children an inspiring environment for education and community.

HotelsModular construction

Twente – Family Homes

Sustainable and solid prefabricated houses

Educational BuildingsRefurbishment & Extensions

HLT Retz

The original building from the 1970s underwent an expansion with the addition of a courtyard building. This new structure seamlessly connects to the existing one, thanks…

Hotels

Houten Hotel Almere

Addition to an existing restaurant with over 172 hotel rooms on four floors.

Refurbishment & Extensions

Timber Lofts

A new four-story building and the renovation and reuse of an existing five-story industrial building

HotelsModular construction

Hotel Green Solution House 2.0

A prototype for sustainable construction

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.
+43 3588 8835
office@klh.at

Sites:
KLH Massivholz GmbH
Gewerbestrasse 4
A-8842 Teufenbach-Katsch
KLH Massivholz Wiesenau GmbH
Wiesenau 2
9462 Bad St. Leonhard

We are there
for you.